As far as I can tell, there is no indication of how long is left in building an item. It would be nice if there was an indication of what percent has been completed and there was an estimate for when the item will finish. Similarly, it would be nice to have an estimated time to completion for the research screen.
-
there is no indication of how long is left in building an item.
It would be nice if there was an indication of what percent has been completed
and there was an estimate for when the item will finish.
If producing several of the same item (say 5 IR-goggles), it would also
be useful to see the time until the next one of these will be completed.
Eg. so you could decide if it would be worth to delay going on a mission,
waiting for an important item to be produced.
-
Interesting idea. Tell me more how that should looks like/behave like, and I will think a bit about implementation.
-
Tell me more how that should looks like/behave like,
Last time I played, it showed only the time (or percentage? - I don't remember)
until the whole batch would be finished.
I propose something like:
Job: 5 IR-Googles
Cost / Time: 1: 200c 20h / 5: 1000c 100h
Completed: 1: 50% / Total: 10%
Time to complete: 1: 10h (today 22:00) / All: 90h (4days)
-
No problem, I will implement this. I miss such info as well.